Engineering Tools and Design

AMCORP employs a comprehensive suite of advanced technical software essential for precision design, structural analysis, and meticulous project scheduling in modern construction. This crucial toolset includes computer-aided drafting software for detailed 2D/3D drafting, specialised programs like STAAD-Pro for complex structural analysis, and BIM (Building Information Modelling) software for integrated design and visualisation. 

This specialised software proficiency ensures that all foundational, structural, and civil designs meet the highest engineering specifications and reliability standards required by major clients, providing confidence in the long-term integrity of the constructed assets, ensuring technical accuracy in every phase.

Management and Site Connectivity

Operational efficiency is critically ensured through the utilisation of specialised project and geotechnical management tools. This includes industry-leading software like Primavera (P6) for advanced project scheduling and specialised programs such as WALLAP for deep foundation analysis. Furthermore, the company successfully implemented its Enterprise Resource Planning (ERP) system in 2014, integrating critical financial and logistical management modules. 

To guarantee operational continuity, remote sites utilise advanced satellite technology and high-speed links for constant communication with the head office, enabling essential real-time data transfer and project oversight.

Operational and Software Proficiency

  • Design & Drafting: Expertise in AutoCAD, BIM, and PLEXIS 3D for detailed 2D/3D design and visualisation, allowing for complete three-dimensional project modelling and analysis.
  • Structural Analysis: Utilises STAAD-Pro for comprehensive structural analysis and WALLAP for deep foundation analysis, ensuring the integrity of complex structural assets.
  • Project Scheduling: Employs Primavera (P6), an industry-leading software, for effective project management and advanced scheduling of complex, multi-phase contracts.
  • Site Connectivity: Maintains high-speed connectivity via SuperDirect VSAT satellite links for reliable remote operations and data transfer, ensuring constant, real-time communication with the project site.
  • Integrated Management: Supports financial and procurement functions through the comprehensive BIZZTRAX ERP system, including Inventory and General Ledger modules for resource tracking.

Integrity in Execution

By investing in and mastering specialised engineering and management software, and maintaining a robust communication infrastructure, AMCORP demonstrates a strong commitment to technical precision and reliable operations. This advanced proficiency ensures reliable data management, accurate structural modelling, and guaranteed project accountability.

No items found.
Other Services

Explore More Solutions

Finishing / Fit-out Works

High-end interior, exterior, and complete renovation solutions.

Utility & Recreational Works

Power, water treatment, healthcare, and essential community facilities.

Exploration Works (Oil & Gas, and Minerals)

Full field development and support for upstream energy projects.

Let's Navigate Projects for Success.

We execute projects with precision, quality, consistency and capacity building.

60+

Years in Industry.