We execute projects with precision, quality, consistency and capacity building.

Construction of ABL’s Lahore tower with 3 basements, Ground + 8 floors, covering 112,000 sft of grey structure, efficiently and safely built in 18 months.
This project involved the construction of a new tower for Allied Bank Limited (ABL) at Babar Block in Lahore, showcasing AMCORP’s capability in commercial high-rise construction. The building features 3 Basements with Ground plus 8 Floors.
The project delivered 112,000 square feet (sft) of grey structure within a demanding 18-month timeline. AMCORP successfully managed to complete the construction on schedule, despite the significant challenges posed by the COVID-19 pandemic
Allied Bank Limited (ABL)
New Garden Town, Lahore, Punjab, Pakistan
Structural Building Works
2019 - 2021
The construction of the ABL Office & Branch represented a key milestone in AMCORP's expanding portfolio of high-rise commercial projects. The structure was designed with 3 Basements to accommodate essential parking and services, topped by the main building comprising Ground plus 8 Floors. This multi-level design necessitated meticulous planning.
Delivering this structure involved advanced Piling Works for the foundation, which is a critical step for ensuring the stability of high-rise buildings. The project achieved a total covered area of 112,000 sft of grey structure. This experience affirmed AMCORP's capability to successfully deliver large-scale, structurally complex buildings, expanding its presence in key urban centres.
The entire grey structure construction was completed efficiently in just 18 months. A notable achievement of this project was successfully maintaining the schedule despite the widespread disruptions caused by the COVID-19 pandemic. This timely delivery speaks volumes about the detailed planning and unwavering commitment demonstrated by the AMCORP teams under challenging conditions.
The project specifically utilised Pile foundations, a technology which AMCORP considered a vital step toward furthering its expertise in high-rise construction within its overall portfolio. The quality of the work further reinforced ABL’s client confidence in AMCORP’s professional execution and diligent resource management.
This successful delivery contributed significantly to AMCORP’s strong, long-term relationship with Allied Bank Limited, a client for whom they have executed multiple projects across Pakistan. The project was executed under the supervision of Habib Fida Ali, a renowned name in architectural and design consultation.
By successfully managing the technical complexity and logistical hurdles, this office tower established AMCORP as a reliable partner in the structural building works sector, particularly in Punjab. This project, alongside the Multan branch construction, served as a foundational stepping stone toward later mega-projects like the ABL Head Office on Mall Road, further showcasing their growth.

Installing comprehensive utility networks (Sewerage, MV Feeder, Fire, Water) for Emaar Oceanfront Phase 2A infrastructure in Karachi.

Grey structure works for ABL's prestigious Ground + 18 floor commercial high-rise in Lahore, reinforcing high-rise capability.
Civil and associated MEP works for the 220/132 kV GIS Grid Station, reinforcing a trusted partnership with Siemens and KfW.