We execute projects with precision, quality, consistency and capacity building.

Construction of the grey structure for a prestigious commercial high-rise, encompassing 217,182 SFT across G+18 floors, including all structural elements.
Allied Bank Limited (ABL)
2024 - Ongoing

Demonstrated AMCORP’s specialised precast expertise by fabricating columns, beams, and slabs 40 km off-site and erecting the structure within 16 days.
Allied Bank Limited (ABL)
2024

Demonstrated AMCORP’s unique expertise as the only company to execute precast building works in a congested area with severe space and time constraints.
Allied Bank Limited (ABL)
2024

Successfully executing extensive piling, excavation, and foundational works for the prestigious Park Edge towers, meticulously reinforcing structural integrity and continuing sustained client trust.
Emaar
2023

Successfully executing complex piling, excavation, and foundational works, including anchoring systems, for the highly challenging 150-day View Tower project for EMAAR.
Emaar
2022

Laying foundational works for Pakistan's tallest residential tower (42 stories), executing 999 piles on reclaimed land against challenging timelines.
Emaar
2020 - 2021

Construction of a new ABL building in Multan with 2 basements and Ground + 6 floors, built on pile foundations and successfully completed on schedule.
Allied Bank Limited (ABL)
2019 - 2021

Construction of ABL’s Lahore tower with 3 basements, Ground + 8 floors, covering 112,000 sft of grey structure, efficiently and safely built in 18 months.
Allied Bank Limited (ABL)
2019 - 2021

Executed a state-of-the-art Cargo Import Hall, a 72,000 sq. ft. pre-engineered building with a curved roof for advanced storage and retrieval systems.
Gerry's Dnata
2016 - 2019

Awarded following successful completion of the ABL Sabzi Mandi Branch, this project was delivered within the scheduled timeline to high-quality standards.
Allied Bank Limited (ABL)
2010 - 2011

AMCORP's first project executed outside its home city, completed in the geographically distant and challenging Muzaffarabad region, showcases AMCORP’s resilience and commitment.
Health Infrastructure Program, AJK
2009 - 2011

Constructed on reclaimed land with 90-foot deep pile foundations, this facility features specialised facade works and was delivered to the highest workmanship standards.
Shaukat Khanum Memorial Hospital
2007 - 2009

Constructed an 80,000 sq. ft. medical facility requiring specialised civil works for radiation therapy bunkers, executed to international safety standards.
Atomic Energy Commission
2007

AMCORP’s first successful project in the banking sector. It was secured through a competitive bid and efficiently delivered on time with high-quality finishes.
Allied Bank Limited (ABL)
2006

Constructed a medical facility designed as a replica of the INFAQ School, adapted to cater to numerous underprivileged patients daily and meet functional needs.
Infaq Foundation
2005 - 2006