We execute projects with precision, quality, consistency and capacity building.

Demonstrated AMCORP’s specialised precast expertise by fabricating columns, beams, and slabs 40 km off-site and erecting the structure within 16 days.
The construction of the ABL Sundar Estate Branch in Lahore served as a powerful demonstration of AMCORP’s specialised expertise in precast works. This innovative approach enabled accelerated timelines and delivered superior quality. The project involved supplying and installing 28 columns, 45 beams, and 48 slabs.
These elements were cast 40 km off-site and successfully erected within a timeframe of just 16 days, showcasing efficiency and precision delivery. This method reinforces client confidence through innovative solutions.
Allied Bank Limited (ABL)
Lahore, Punjab, Pakistan
Structural Building Works
2024
The ABL Sundar Estate Branch project was strategically designed to showcase AMCORP's mastery of precast construction, a method central to their diversification efforts. Utilising this technique, the company was able to manufacture all structural components. Specifically, 28 columns, 45 beams, and 48 slabs, miles away from the building site. This off-site fabrication occurred approximately 40 km from the final location.
This logistical approach highlights AMCORP's efficiency in strategic execution and resource optimisation. By moving the bulk of the intensive concrete casting work to the company yard, they effectively mitigated construction disruption and minimised material storage needs at the congested urban site.
The most significant achievement of this project was the speed of the on-site assembly. The entire set of structural precast elements, once transported from the fabrication yard, was successfully erected within an astonishingly rapid schedule of just 16 days. This exceptional pace validated the core advantage of precast solutions, drastically accelerating timelines.
This quick turnaround ensured that AMCORP delivered superior quality while achieving remarkable construction efficiency and precision. The project’s success showcased the company’s ability to deliver time-efficient and reliable construction solutions for commercial clients.
The ABL Sundar Estate Branch project builds on AMCORP's strong and developing portfolio of precast works. It stands alongside other successful projects utilising this innovative technology, including the SECMC Silo, PARCO Coastal Refinery, and the ABL Timber Market Branch.
By delivering this branch in Lahore, AMCORP reinforced the client confidence of Allied Bank Limited through its specialised expertise. This commitment to pioneering and executing advanced construction techniques solidifies AMCORP's position as a market leader in innovative structural solutions.

Installing comprehensive utility networks (Sewerage, MV Feeder, Fire, Water) for Emaar Oceanfront Phase 2A infrastructure in Karachi.

Grey structure works for ABL's prestigious Ground + 18 floor commercial high-rise in Lahore, reinforcing high-rise capability.
Civil and associated MEP works for the 220/132 kV GIS Grid Station, reinforcing a trusted partnership with Siemens and KfW.