Construction Of Early Works of Park Edge - Rp. 06

Successfully executing extensive piling, excavation, and foundational works for the prestigious Park Edge towers, meticulously reinforcing structural integrity and continuing sustained client trust.

Overview

AMCORP successfully executed the Early Works for the Park Edge towers at EMAAR Oceanfront, a project focused on complex piling and foundational stability. The core scope included the installation of 455 piles (up to 45m deep) and specialised ancillary works like shotcrete, drilling, grouting, and pre-stressed anchors.

The project involved meticulous coordination with major consultants and was subject to comprehensive static and dynamic load testing, reinforcing our reputation for precision and compliance in large-scale urban development.

Client

Emaar

Location

Emaar Oceanfront, Karachi

Sector

Structural Building Works

Timeline

2023

No items found.

Foundation Piling and Complex Scope

This project involves the execution of extensive Early Works for the prestigious Park Edge towers, marking another successful collaboration with EMAAR. The scope demanded meticulous precision for foundational stability in a challenging coastal environment. We worked closely with leading consultants and partners, including Costveyor, Pro-Mag, and Ali Arshad Associates, to ensure all technical specifications were met.

The core challenge involved substantial piling works, requiring the execution of 455 piles in total. This included 392 foundation piles and 63 tangent piles, designed to secure the foundation of the high-rise structure. The project required continuous coordination between our engineers and the client's team to ensure flawless execution in line with demanding urban construction standards.

Technical Execution and Quality Assurance

The piling scope involved large-diameter piles ranging from 750 to 1200 mm and reaching impressive depths up to 45 meters. This required specialised equipment and expertise in deep foundation installation. Beyond the piling itself, AMCORP executed complex ancillary works crucial for ground stability and structural support.

These ancillary works included the application of shotcrete, lean concrete, and the installation of geo-textile materials. Furthermore, the project required precise drilling and grouting, the installation of pre-stressed anchors, and the final placement of waller beams. All processes, including excavation and installation, were subject to comprehensive static and dynamic load testing, guaranteeing compliance with the highest quality and safety standards.

Client Credibility and Project Success

The successful delivery of the Park Edge Early Works reinforces AMCORP's expertise in executing complex foundation contracts, particularly in challenging urban or reclaimed land environments like EMAAR Oceanfront. This project is built upon the success of previously completed early works for other high-rise towers in the development, demonstrating consistent quality and reliability.

By mastering such detailed and high-risk foundational work, AMCORP continues to prove its capability to deliver essential substructures for major vertical construction. The repeat business from a key multinational client like EMAAR validates our dedication to technical competence and stringent site safety, ensuring every foundation is built to last.

Our work

Our portfolio of excellence.

Emaar Phase 2A Infrastructure

Installing comprehensive utility networks (Sewerage, MV Feeder, Fire, Water) for Emaar Oceanfront Phase 2A infrastructure in Karachi.

ABL Lahore High-Rise

Grey structure works for ABL's prestigious Ground + 18 floor commercial high-rise in Lahore, reinforcing high-rise capability.

Siemens Gharo Grid Civil

Civil and associated MEP works for the 220/132 kV GIS Grid Station, reinforcing a trusted partnership with Siemens and KfW.

About project
Let's Navigate Projects for Success.

We execute projects with precision, quality, consistency and capacity building.

60+

Years in Industry.